Gas Lift Optimization cont 1

Wells that can only Flow under gas Lift


WTEST can be used to revive a dead well by adding lift gas
The WIG  is calculated based on the total number of lift gas increments that would give the well the largest ratio of oil production rate to lift gas injection rate (line 
O-A)
If a well is only just able to flow (at point B), the WDG is calculated based on all the increments (line O-B)
Using the GLO Facility (1)


Prepare the VFP Tables - VFPPROD
ALQ = lift gas injection rate (GRAT)
VFPTABL
1 = Linear interpolation
2 = Cubic Spline interpolation
LIFTOPT keyword
Activates the GLO facility
Sets: 
incremental size for lift gas injection rate
Min economic gradient
Min interval between GLOs
GLO during each of the 1st NUPCOL iterations?
 WLIFTOPT keyword 
Well name 
Is the well to be optimized using GLO? 
Max lift gas injection rate 
Weighting factor for preferential allocation of lift gas 
Min lift gas rate 
>0 = Min rate unless the well cannot flow 
<0 = at least enough lift gas to enable the well to flow 
allocate in decreasing order of weighting factor to group of wells 
Note: By default, no lift gas is allocated if the group’s target can be met unless the weighting factor > 1.0
GLIFTOPT keyword (optional)
group lift gas supply limits
group lift gas rate = SUM well lift gas rate x efficiency factor
maximum total (produced + lift ) gas rate for the group
Group Production Rate Limits
Lift gas is allocated if a group/field cannot reach its OPR
subject to lift gas supply limits, other phase limits (unless 
necessary to make the well’s Min lift requirement & the well’s
 weighting factor > 1.0)
Rates could change if GLO is only in the 1st iteration
Use with network option
GLO when the network is being balanced 
if the network is only balanced in the 1st iteration, GLO is only in the start of the time step
if the network is only balanced in the 1st NUPCOL iterations, GLO will also be carried out in the 1st NUPCOL iterations
Computing time increases with (No. wells)2
effect of lift gas in pipe line:
item 6 of GRUPNET
‘FLO’ = add wells’ lift gas to the branch. The total GFR is used in VFP table
‘ALQ’ = total ALQ = SUM of wells’ ALQs = the total ALQ is used in VFP table
  
Output
Gas lift injection rate: FGLIR, GGLIR, WGLIR
well oil gas lift ratio: WOGLR 
FGPR & WGPR do not include injected lift gas
Restrictions
Do not use
GLIFTLIM - Max(sum ALQ), Max No. wells on artificial lift
the lift switching option in WLIFT
Use GLIFTOPT and WLIFTOPT instead
Flux Boundary Conditions facility should no be used
lift gas supplied to wells outside the flux boundary is not taken into account