Our new-generation coiled tubing (CT) equipment further increases the efficiency of these services. CT EXPRESS rapid-deployment unit has reduced rig uptime from 3 hours to less than 30 minutes. CT SEAS safer, efficient, automated solution has reduced operations from 3.5 days to 2.

CT EXPRESS

Coiled Tubing Technology Combines Speed and Efficiency

The CT EXPRESS rapid-deployment coiled tubing (CT) service is designed for low-pressure, intermediate-depth land-based wells. This service
  • combines capabilities of four trucks into two tractor trailer units
  • enables quick rig up and rig down
  • eliminates the need to work under suspended load or climb on unit
  • provides process control of CT and pumping functions
  • improves job efficiency, economics, and safety of operation
  • provides reliability over rough terrain and in extreme conditions.
The system is designed to complement CT operations with low pump rates, moderate pressures and nonstop pumping.
By electrically controlling the coiled tubing unit and pumps from the control chair, the unit provides better use of manpower, eliminating communication problems among operators.

CT SEAS

Offshore Coiled Tubing Unit Offers Flexibility and Efficiency

CT SEAS coiled tubing safer, efficient, automated solutions reduce the amount of time and the number of people needed. The CT SEAS highly flexible, fit-for-purpose unit is readily adaptable for many offshore structures, including platforms, floaters, and tension leg platforms. This high degree of flexibility gives you the full capabilities of a conventional coiled tubing (CT) unit.
A key philosophy driving the design architecture was the creation of safer, efficient, and functional skid packages. The system comprises just 10 primary skids, which reduce crane lifts from 53 to only 36 on a typical operation in the North Sea.
This reduction in lifts is achieved by delivering many components to the wellsite as assembled units. For example, riser and triple BOP components travel as preassembled and tested units, and the injector is assembled to the jacking frame and stripper with the gooseneck attached.

CT TComp

Offshore Coiled Tubing Total Compensation Package Increases Safety and Efficiency

CT TComp coiled tubing (CT) total compensation system for offshore protects wellhead integrity during CT operations by limiting wellhead stresses. The system compensates for vertical and horizontal wellhead motion inside or outside the derrick. Rig up is faster and requires less personnel than with conventional systems.
The system is preassembled in three skids, one each for the hydraulic power unit, BOP, and injector. Fewer than half the minimum number of lifts are required to load conventional equipment onto the platform. All components are delivered, installed, and tested within their frames without requiring unpacking or assembly. Virtually every feature is designed to save time and reduce costs.
The system can be used as
  • a motion-compensated jacking frame
  • a 350-ton tension-lift frame
  • an internally compensated tension.